Short answer
Ordering metal cutting starts by sending a vector file — DXF, DWG, AI or SVG — or a hand-drawn sketch with dimensions; the minimum order is 1 piece, a quote arrives within 24 hours, standard production takes 2-5 working days, and the finished part is collected at the Tbilisi workshop or shipped by courier anywhere in Georgia.
Craftarea has cut metal on a fiber-laser CNC machine in Tbilisi for 7+ years, across 500+ completed projects, from single parts to repeat production runs. This page covers the mechanics of placing an order: which file to send, how fast a quote arrives, how many days production takes, and how terms change for larger runs. Orders are accepted in stainless steel (inox), carbon steel, aluminium, copper and brass sheet — carbon steel up to 10mm, stainless up to 6mm, aluminium up to 5mm, copper and brass up to 3mm. If you have no drawing, we produce one from your sketch. The full pricing formula lives on the dedicated pricing page.
The minimum order is 1 piece — you don't need to buy 10, 50 or 100 units to get a single part cut. That differs from industrial workshops, where minimum runs often start in the tens because of machine setup cost. One metal nameplate, one ornamental panel or a single test sample are all accepted equally, on every material and thickness. The more pieces you order at once, the lower the per-piece cost, because setup time is spread across the whole batch — the exact formula for that is on the pricing page.
Cutting requires a vector file with closed contours — DXF, DWG, AI, SVG or vector PDF. A raster image (JPG, PNG) cannot be cut directly, because the machine reads a contour rather than pixels; such a file needs vectorization first, which we perform when required. If you have no file at all, a hand-drawn sketch with dimensions is enough — we produce the drawing. Technical file requirements — units, minimum hole diameter, kerf allowance — are set out in a separate guide.
After you send a file, a quote arrives within 24 hours — the figure depends on material, thickness, total cut length and quantity. Once confirmed, standard production takes 2-5 working days, depending on workshop load and part complexity. Simple, small parts typically land at the lower end of that range; multi-contour ornaments at the upper end. If timing is critical, say so when you place the order — moving up the queue is possible when the production schedule allows.
Orders above 50 pieces are treated as bulk and move to separate terms: material is sourced as one batch, pricing shifts from a per-piece rate to total cutting time, and production extends to 5-10 working days depending on batch size and part complexity. For repeat production, the approved drawing and parameters from the first batch are kept on file, so second and third orders need no re-specification — just state the quantity. Producing one control sample before releasing a large batch is recommended.
An order covers sheet cutting on the fiber-laser CNC machine, dimensional checking and cut-edge finishing. Engraving can be done on the same machine alongside cutting. We do not have press-brake bending, CNC milling, lathe work, plasma or waterjet cutting in-house — if a part needs bending, or steel thicker than 10mm, we say so in the quote itself and route the job to a vetted partner workshop. In that case we cut the part and the partner performs the remaining operation, with the lead time extended accordingly.
Finished orders can be collected directly at the Tbilisi production workshop. Courier delivery is available within Tbilisi, and for the rest of Georgia — Batumi, Kutaisi, Rustavi and other cities — parts ship via a courier company, typically in 2-4 working days depending on destination and seasonal load. Delivery cost is not included in the part price and is calculated separately by weight and destination. The exact timeline and rate are confirmed when the order is placed, by phone at +995 557 771 979 or email at info@craftbox.ge.
| Quantity | Quote turnaround | Production time | Pricing basis | Control sample |
|---|---|---|---|---|
| 1 piece | 24 hours | 2-5 working days | Per piece + setup cost | Not needed |
| 2-9 pieces | 24 hours | 2-5 working days | Per piece, setup shared | Optional |
| 10-49 pieces | 24 hours | 3-7 working days | Per piece, reduced rate | Recommended |
| 50+ pieces | 24 hours | 5-10 working days | Total cutting time | Recommended |
Send a vector file (DXF, DWG, AI, SVG) or a dimensioned sketch — by email to info@craftbox.ge or via the site form.
Within 24 hours you get a quote based on material, thickness, cut length and quantity.
Confirm material, thickness, quantity and collection method — the order enters the production schedule.
The part is cut on the fiber-laser CNC machine with ±0.1mm positional accuracy.
The part is checked against dimensions, with cut edges cleaned and finished where needed.
Collect at the Tbilisi workshop, or receive by courier anywhere in Georgia in 2-4 working days.